MOREL

Installation Manual

FEMALE PLUG M

FEMALE PLUG M

WATERTIGHT CONNECTION CAN ONLY BE GUARANTEED WHEN THE POLARITY (+/-) IS ALIGNED CORRECTLY.

MOREL LED light

Starting cable - from AMTEK Control Box to 1st MOREL LED light

Cable between two MORELs

Power Supply Housing (ACB)

1. Connect start cable 1 to power supply bracket

2. Connect start cable 1 to MOREL

3. Align flat areas before connecting

6. Verify that MOREL body is firmly attached to the fixed steel cable

4. Female connector (MOREL)

7. Use cable 2
to connect the next MOREL

5. Male connector (cable)

8. End of the line end cap.
Tighten screw-nut firmly!