MOREL

Installation Manual

FEMALE PLUG M

FEMALE PLUG M

WATERTIGHT CONNECTION CAN ONLY BE GUARANTEED WHEN THE POLARITY (+/-) IS ALIGNED CORRECTLY.

MOREL LED light

Starting cable - from AMTEK Control Box to 1st MOREL LED light

Cable between two MORELs

Power Supply Housing (ACB)

1. Connect start cable 1 to power supply bracket

2. Connect start cable 1 to MOREL

3. Align flat areas before connecting

6. Verify that MOREL body is firmly attached to the fixed steel cable

4. Female connector (MOREL)

7. Use cable 2
to connect the next MOREL

5. Male connector (cable)

8. End of the line end cap.
Tighten screw-nut firmly!

Veuillez remplir le formulaire ci-dessous
Por favor complete el siguiente formulario
Please complete the following form

• Points visible through BACnet®
• Wireless control of end-devices
• Supports up to 30 connected controllers per gateway
• Third-party interoperability through your preferred BACnet® IP system

VOLTAGE
TYPICAL
CONSUMPTION

24 VAC ± 15%; 50/60 HZ | 24 VDC ± 10%.
5 VA + output (VAC); 1.6 W + output (VDC)

PIKON’s compact design and Fast-Wire-connector-on-fixed-steelcable installation make it particularly well-suited to deliver ideal
light levels for birds in oor farm operations with lower height
ceilings that do not require lamp cable extensions**.

TECHNOLOGY
POWER
VOLTAGE
LUMENS
EFFICACY
CRI
CCT

LED
9 W
48 VDC
1000
111.11 lm./W
> 85 Ra.
3000 Kelvin*

With its extended length and light weight, the SONI pendant luminaire is an excellent option for floor farm operations with high ceilings, delivering illumination most appropriate for birds on the lower section of the space.

TECHNOLOGY
POWER
VOLTAGE
LUMENS
EFFICACY

LED
9 W
48 VDC
1000 delivered
111.11 lm./W