WATERTIGHT CONNECTION CAN ONLY BE GUARANTEED WHEN THE POLARITY (+/-) IS ALIGNED CORRECTLY.

SURFACE-MOUNTED

SUSPENDED

STEEL-CABLE-MOUNTED
ASSEMBLY INSTRUCTIONS
1. Attach the support brackets and lights firmly to the ceiling of the building, whether your system will be mounted directly onto
the ceiling surface, suspended from brackets, or attached to steel cable. Lamps should be spaced 5.2 m. from each other.
2. Connect the AMTEK dimmer box to the hardwired power supply cable, and then connect the dimmer to the junction box.
3. Connect the output cables coming from the junction box to the first lamps on each of the rows to be installed. (If installing a vertical setup, join the cables to the first “T” connector instead.)
4. Join the plug-and-play connectors between 2 lamps (male to female) until you finish the row. (If installing a vertical setup, join the cables to between the “T” connectors holding the lamps.)
5. At the end of the row, unscrew the cable gland on the last lamp (A) and remove the end cap (B). Loosen the two screws and remove the wire (C). Replace the end cap and screw the cable gland tightly (D).
2. Connect the AMTEK dimmer box to the hardwired power supply cable, and then connect the dimmer to the junction box.
3. Connect the output cables coming from the junction box to the first lamps on each of the rows to be installed. (If installing a vertical setup, join the cables to the first “T” connector instead.)
4. Join the plug-and-play connectors between 2 lamps (male to female) until you finish the row. (If installing a vertical setup, join the cables to between the “T” connectors holding the lamps.)
5. At the end of the row, unscrew the cable gland on the last lamp (A) and remove the end cap (B). Loosen the two screws and remove the wire (C). Replace the end cap and screw the cable gland tightly (D).